Projects

Below are some of the major projects we have been involved in throughout the past years:

Removal of ACM for Halliburton GmbH

In July 2006 PTM was contracted for the removal of ACM from various buildings in Tripoli, Libya and Camp Fox 3 in the Libyan desert.

Removal of ACM, Ta’ Qali

In July 2006 PT Matic was contracted for the removal of asbestos roofs and soffits from the ex-Counting Halls, Medical and Food Stores in Ta’ Qali

Removal of ACM from Dedicated Micros

In November 2006 PTM was entrusted with the removal and disposal of asbestos soffits from the Dedicated Micros Factory.

Removal of ACM from FIO Didon

In July 2007 PT Matic removed and disposed of asbestos insulation from the engine room on board vessel FIO Didon. 

Asbestos Survey onboard Songa Saturn

In December 2008 PTM conducted a full Type II survey for the identification of ACM on board vessel Songa Saturn.

Environmental Survey and Impact Assessment for Mellitah Oil & Gas B.V.

In July 2008 PTM won the contract for carrying out a sophisticated Environmental Baseline Survey and Impact Assessment in Libya.  The client was re-opening two dormant wells and installing the necessary plant to exploit this substantial resource.  PTM also produced the Environmental plan which helped in mitigating the impact of this major development in a pristine area.

Removal of ACM from the Gozo General Hospital

Throughout the past 5 years PTM has carried out numerous interventions for the removal and disposal of ACM from various areas inside the Gozo General Hospital.

Removal of Fly Ash from Incinerator and Power Stations

Since November 2009 PT Matic has been responsible for the removal and recovery of Fly Ashes, Filter Cakes and Boiler Washings from the Incinerator and all the Power Stations in Malta.

Removal of ACM from Boffa Hospital

In multiple projects in 2009 and 2010 PT Matic was responsible for the removal of ACM from the Boiler House in Sir Paul Boffa Hospital.

Management of Asbestos Waste from Civic Amenity Sites found in Malta and Gozo

Since 2009 PTM was assigned to manage the Asbestos Wastes around the islands of Malta and Gozo, found in the Civic Amenity Sites.

Removal of ACM pipeline from Smart City Malta

In March 2010 PTM was contracted for the removal and disposal of over 100m of asbestos pipeline from the Smart City Malta grounds.

Removal and Disposal of Various Chemical Waste from the Malta Shipyards

In March 2010 PT Matic was entrusted with the clearance and disposal of 600 tonnes of hazardous waste from the Malta Shipyards.  The waste handled included waste oils, lubricating oils, sludges, acids, solvents, paints and varnishes, contaminated soils, etc., spread over four different sites which were all cleared and properly disposed of over a span of two months.

Removal and Thermal Destruction of Cytotoxic Waste from Mount Carmel Hospital

In August 2010 PT Matic was contracted to clear and ship an undefined quantity of cytotoxic waste.  This waste had been accumulating over long periods of time from all the hospitals on the islands.  PTM ultimately handled 25,000 cytobins which were shipped overseas for thermal destruction.

Waste Oil and Sludge from Ras Hanzir

In January 2011 PTM cleared 7,000,000 litres of waste oil from the Enemalta Ras Hanzir Installation.  The oil had been accumulating over many years and was removed and shipped in special barges for proper disposal overseas.

Removal of ACM from various University of Malta Buildings

In 2010 and 2011 PTM carried out a number of interventions for the removed and disposal of asbestos waste from UOM buildings.

Shipment and Recovery of Waste Electrical and Electronic Equipment (WEEE) and Dry Batteries

Since 2010 PTM has handled and shipped overseas for recovery various kinds of WEEE such as fridges, freezers, TVs, Monitors, Washing Machines, Air Conditioners, Microwave Ovens, Dry Batteries, etc.

Removal of ACM from City Gate

In April 2011 PTM was entrusted with the removal of asbestos down pipes as part of the City Gate Project in Valletta.

Removal of ACM from Fort St Elmo

In May 2011 PTM was entrusted with the removal of an asbestos shed from Fort St Elmo, Valletta as part of the Grand Harbour Regeneration Project.

Collection and Recovery of Shredded Wood Waste

In May 2011 PTM was awarded the contract for the shipment and recovery of 1,000 tonnes of shredded wood waste from the Ghallis Landfill.

Collection and Disposal/Recovery of Solid and Liquid Pharmaceutical Waste

As from June 2011 PTM is responsible for the shipment and disposal or recovery both solid and liquid pharmaceutical waste from most of the local pharmaceutical producers.  PTM is also handling solvents ISO tanks in bulk for recovery.

Removal and Disposal of ACM Roofing from the Aurora Theatre in Gozo

In August 2011 PTM was entrusted with the clearance and disposal of 1,000m2 of ACM roofing from the Leone Band Club Aurora Theatre in Gozo.  The project was completed in 2 weeks and was followed by a complete reroofing of the theatre.

Shipment and Recovery of Refuse Derived Fuel

Since August 2011 PTM has been awarded multiple contracts for the shipment and recovery of many tonnes of paper and plastic waste from the Sant Antin Waste Treatment Facility. 

Monitoring of Stack Emissions

PTM has over the years conducted several emissions monitoring exercises and testing of stack emissions for industry

Shipment and Disposal of Oil Sludge

As from 2012 PTM has been responsible for the handling and disposal of oil sludge and oil contaminated waste from a number of oil operators on the islands

Environmental Cleanup

In 2012 PTM undertook an Environmental Clean-up .

Legionella Testing and Chlorination of Tanks

In 2012 PTM undertook the assignment of testing for Legionella as well as Chlorinating water tanks for one of the leading Banks on the island.

Loading and Export of Narcotic and Psychotropic Waste

In 2012 PTM was awarded the duty for Loading and Export of Narcotic and Psychotropic Waste by one of the islands leading Pharmaceutical companies

Delivery of Medicinals for Thermal Destruction

In 2012 PTM undertook the duty of delivering medicinals for thermal destruction

Tender for Removal, Packaging and Disposal of Asbestos

In 2012 PTM was awarded the tender for the Removal, Packaging and Disposal of Asbestos from sites operated by the Armed Forces of Malta.

Collection and Export of Chemotherapy Waste and Cytotoxic Waste

Since 2012 PTM was entrusted by the Ministry for Health, the Elderly and Community Care to collect and Export all its Chemotherapy Wastes and Cytotoxic Wastes from Hospitals and Pharmaceutical Stores.

Asbestos Survey

In 2012 PTM undertook an Asbestos Survey for a leading semi conductor manufacturer based on the island.

Removal of ACM fittings

In 2012 PTM undertook the assignment of removing ACM fittings from the University of Malta

Collection and Disposal of Paint Sludge from Toly Products

In May 2013 PTM was entrusted with the testing, characterisation and handling for disposal of several tonnes of liquid and sludge paint and lacquer waste

Removal and Disposal of ACM from Industrial Motors Ltd

In 2013 PTM was entrusted with the removal of ACM shed from Industrial Motors Ltd, Blat il- Bajda.

Spraying of ACM at Muscat Motors Ltd

In 2013 PTM was awarded the task of Spraying the Asbestos roofing located at the customer’s site.

Delivery of Asbestos Handling and Awareness Course at ACTC

In 2013 PTM delivered training course in Asbestos handling for ACTC students in Libya.

Removal and Disposal of ACM from Marsa Open Centre

In 2013 PTM was entrusted with the removal of asbestos materials and decontamination from the Marsa Open Centre.

Loading and Export of Grit Waste in Bulk Vessel

In 2013 PTM took on the loading and bulk export of Grit Waste.

Loading & Export of Absorbents, Rags contaminated with dangerous substance

In 2013 PTM was authorised to load and export hazardous absorbents and rags.

Asbestos Survey on FPSO Didon

In 2013 and 2014 PTM carried out Asbestos surveys and delivered training to staff on board vessel FIO Didon.

Removal and Disposal of ACM from MY Istros

In 2013 PTM was entrusted with the removal of asbestos materials and decontamination from 1954 super yacht MY Istros

Removal and Disposal of ACM shed from Old Rabat Train Station

In 2014 PTM was entrusted with the removal, clearance and disposal of an ACM shed from the Old Rabat Train Station.  The project was completed in 1 week.

Collection and Disposal of Mercury Waste from Gozo General Hospital

In 2014 PTM was entrusted with the collection and disposal of Mercury Wastes generated by the General Hospital in Gozo.

Removal and Replacement of ACM Down Pipes from a Pharmaceutical Company

In 2014 PTM was entrusted with the removal and replacement of down pipes located on site of one of the island’s pharmaceutical companies. Works were completed in 1 week.

Removal and Disposal of ACM Boilers

In 2014 PTM undertook the removal and disposal of ACM around pipes and boilers inside one of Malta’s leading hotels

Removal and Disposal of ACM roof at One One O the Strand, Sliema

In 2014 PTM was awarded the responsibility to remove and dispose of ACM roofing located at One One O, the Strand, in Sliema.  